11-Month Builder Warranty Inspection in Orange County, FL
Did you buy a newly constructed home in Orange County in the past year? Before your builder's one-year warranty expires, schedule an 11-month warranty inspection to document defects and hold the builder accountable. We serve Lake Nona, Oviedo, Orlando, and communities throughout Orange County — written report with photos, delivered within 24 hours.
What the 11-Month Inspection Covers
After a year of occupancy, new Orange County homes commonly reveal settling issues, HVAC performance deficiencies, grading drainage problems, and cosmetic defects that weren't apparent at closing. Our 11-month inspection provides a systematic, documented record of these findings — giving you the written evidence needed to submit a warranty claim before the builder's one-year obligation ends.
Structural Settling
Drywall cracks, sticking doors and windows, and foundation settling that appear after a full cycle of Florida's temperature and humidity fluctuations.
HVAC Performance
Cooling system performance after a full Florida summer — duct leakage, thermostat calibration, and airflow balance issues often surface after full-season operation.
Grading & Drainage
Orange County's rainy season reveals grading deficiencies not apparent at closing — water pooling near the foundation or improper lot drainage slope.
Cosmetic & Mechanical
Paint, caulking, trim, door hardware, window operation, and appliance function — items the builder is obligated to address under warranty.
Why the 11-Month Timing Matters for Orange County New Builds
Most Florida builders provide a one-year workmanship warranty and a structural warranty beyond that. Once the first year expires, many cosmetic and workmanship defects become the homeowner's responsibility. Scheduling the inspection at 11 months gives you time to compile the report, submit warranty claims, and follow up before the deadline passes. In Orange County's active new construction market — particularly Lake Nona and Oviedo — we complete 11-month inspections throughout the year.
- Document defects while the builder's one-year warranty is still active
- Systematic inspection covering all major systems and finishes
- Same-day written report ready to submit directly to your builder
- HVAC, grading, settling, and cosmetic issues all documented with photos
- Experience with Orange County's major builder communities including Lake Nona
- Bilingual service — results explained in English or Spanish
11-Month Warranty Inspection Cost in Orange County
11-month warranty inspection pricing is based on home size and location in Orange County. Call (954) 899-3713 for a quote on your specific community and home size.
Your 11-month warranty inspection report is delivered within 24 hours so you can begin the warranty claims process immediately.
Pre-Closing + 11-Month Warranty Bundle
Many Orange County new construction buyers schedule both a pre-closing inspection and return at 11 months for the warranty follow-up. The pre-closing inspection catches issues before you take possession; the 11-month inspection catches what only becomes apparent after a full year of occupancy — especially after Orange County's rainy season and summer heat cycle.
See the 11-month warranty inspection pages for Oviedo and Lake Nona, or visit the Greater Orlando service area page.
11-Month Warranty Inspections Across Orange County
We provide 11-month warranty inspections for new construction homeowners throughout Orange County, including active builder communities in:
Live in a new construction community not listed here? Contact us. Visit our Orange County service area page for full coverage details.
11-Month Warranty Inspection FAQs — Orange County
When exactly should I schedule my 11-month warranty inspection in Orange County?
What if my builder disputes the findings?
What are the most common 11-month warranty findings in Orange County new builds?
My builder's superintendent said they don't need to see a third-party report. What should I do?
Ready to schedule your inspection?
Call or fill out the online form — we respond quickly and offer same-week availability. Reports delivered within 24 hours.